Shipping to and from U.A.E.
Your complete guide to shipping to and from U.A.E. Find the right route, get Maersk office locations, discover local solutions, payment options and more.
Export
Consulta le informazioni locali aggiornate su: procedure di esportazione e restrizioni, demurrage e detention, pick-up dei container e molto altro.
Combined Demurrage and Detention
Combined demurrage and detention starts from gate-out empty day (included) from terminal, ends with shipped on board date (included).
Currency - AED
Free time
| TYPE | DRY | FLAT & OPEN TOP | REEFER | IMO |
|---|---|---|---|---|
|
TYPE
DAYS
|
DRY
10
|
FLAT & OPEN TOP
5
|
REEFER
5
|
IMO
5
|
Tariff after free time
| Days after freetime expiration | 20' DRY/NOR | 40'/45' DRY/HC/NOR |
|---|---|---|
|
Days after freetime expiration
Day 11– 14
|
20' DRY/NOR
85
|
40'/45' DRY/HC/NOR
170
|
|
Days after freetime expiration
Day 15 - 21
|
20' DRY/NOR
170
|
40'/45' DRY/HC/NOR
340
|
|
Days after freetime expiration
Day 22 Onwards
|
20' DRY/NOR
340
|
40'/45' DRY/HC/NOR
680
|
| Days after freetime expiration | 20' REEF | 40' REEF | 20'FLAT / OPEN TOP | 40'FLAT / OPEN TOP | 20'IMO / 40'IMO |
|---|---|---|---|---|---|
|
Days after freetime expiration
Day 6 - 10
|
20' REEF
250
|
40' REEF
500
|
20'FLAT / OPEN TOP
85
|
40'FLAT / OPEN TOP
170
|
20'IMO / 40'IMO
85 / 170
|
|
Days after freetime expiration
Day 11 – 15
|
20' REEF
500
|
40' REEF
1000
|
20'FLAT / OPEN TOP
170
|
40'FLAT / OPEN TOP
340
|
20'IMO / 40'IMO
170 / 340
|
|
Days after freetime expiration
Day 16 Onwards
|
20' REEF
1000
|
40' REEF
2000
|
20'FLAT / OPEN TOP
340
|
40'FLAT / OPEN TOP
680
|
20'IMO / 40'IMO
340 / 680
|
Storage
Mention triggers for calculation as per standard triggers
All U.A.E Ports excluding Sharjah , Fujairah
Free time
| TYPE | 20' ALL TYPES | 40' ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
TYPE
Days
|
20' ALL TYPES
10
|
40' ALL TYPES
10
|
20'OOG
10
|
40'OOG
10
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
Days after freetime expiration
Day 11 - 30
|
20' ALL TYPES
31
|
40' ALL TYPES
62
|
20'OOG
93
|
40'OOG
186
|
|
Days after freetime expiration
Day 31 - 60
|
20' ALL TYPES
41
|
40' ALL TYPES
82
|
20'OOG
123
|
40'OOG
246
|
|
Days after freetime expiration
Day 61 onwards
|
20' ALL TYPES
82
|
40' ALL TYPES
164
|
20'OOG
246
|
40'OOG
492
|
Fujairah PORT - Free time:
| TYPE | 20'ALL TYPES | 40'ALL TYPES |
|---|---|---|
|
TYPE
Days
|
20'ALL TYPES
1
|
40'ALL TYPES
1
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES |
|---|---|---|
|
Days after freetime expiration
Day 2 - 11
|
20' ALL TYPES
60
|
40' ALL TYPES
100
|
|
Days after freetime expiration
Day 12- 21
|
20' ALL TYPES
90
|
40' ALL TYPES
175
|
|
Days after freetime expiration
Day 22 onwards
|
20' ALL TYPES
175
|
40' ALL TYPES
350
|
Sharjah PORT - Free time:
| TYPE | 20'ALL TYPES | 40'ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
TYPE
Days
|
20'ALL TYPES
30
|
40'ALL TYPES
30
|
20'OOG
NIL
|
40'OOG
NIL
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES |
|---|---|---|
|
Days after freetime expiration
Day 31 - 60
|
20' ALL TYPES
75
|
40' ALL TYPES
150
|
|
Days after freetime expiration
Day 61 onwards
|
20' ALL TYPES
150
|
40' ALL TYPES
300
|
Tariff after free time
| Days afterfreetimeexpiration | 20'OOG | 40'OOG |
|---|---|---|
|
Days afterfreetimeexpiration
Day 1 - 10
|
20'OOG
60
|
40'OOG
120
|
|
Days afterfreetimeexpiration
Day 11 - 30
|
20'OOG
90
|
40'OOG
180
|
|
Days afterfreetimeexpiration
Day 31 - 60
|
20'OOG
160
|
40'OOG
320
|
|
Days afterfreetimeexpiration
Day 61 onwards
|
20'OOG
200
|
40'OOG
400
|
UAE ports Cut off Details - WK 34-35 2026
| Port | Vessel Name | Voyage | ETA | ETD | Booking Cut off | Load list / SI Cut off | 3rd Party SOC loadlist submission deadline | VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade |
|---|---|---|---|---|---|---|---|---|
| Jebel Ali T2 | MAERSK YORKTOWN | 633N | Sat 22 19:00 | Sun 23 12:00 | Thu 20 11:00 | Thu 20 17:00 | Thu 20 08:00 | Sat 22 07:00 |
| Port | Vessel Name | Voyage | ETA | ETD | Booking Cut off | Load list / SI/ VGM Cut off | ED Document to be share with Maersk | Jebel Ali Gate in / Inspection |
|---|---|---|---|---|---|---|---|---|
| Khor Fakkan | ALETTE MAERSK | 630E | Thu 20 17:45 | Mon 24 03:00 | Thu 13 09:00 | Thu 13 14:00 | Fri 14 10:00 | Fri 14 17:00 |
| Khor Fakkan | MAERSK GAIRLOCH | 628S | Tue 25 00:12 | Thu 27 12:12 | Tue 18 09:00 | Tue 18 14:00 | Wed 19 10:00 | Thu 20 00:12 |
| Khor Fakkan | MAERSK BALTIMORE | 635S | Tue 25 06:00 | Thu 27 18:00 | Tue 18 09:00 | Tue 18 14:00 | Wed 19 10:00 | Thu 20 06:00 |
| Khor Fakkan | MAERSK BALTIMORE | 637S | Wed 02 10:00 | Fri 04 22:00 | Wed 26 09:00 | Wed 26 14:00 | Thu 27 10:00 | Fri 28 10:00 |
| Khor Fakkan | MAERSK GAIRLOCH | 629S | Thu 03 19:12 | Sun 06 07:12 | Thu 27 09:00 | Thu 27 14:00 | Fri 28 10:00 | Fri 28 17:00 |
| Khor Fakkan | TAURANGA MAERSK | 636E | Thu 10 01:00 | Fri 11 21:01 | Thu 03 09:00 | Thu 03 14:00 | Fri 04 10:00 | Fri 04 17:00 |
| Khor Fakkan | MAERSK BALTIMORE | 639S | Fri 11 19:00 | Mon 14 07:00 | Fri 04 09:00 | Fri 04 14:00 | Fri 04 17:00 | Fri 04 17:00 |
| Khor Fakkan | MAERSK GAIRLOCH | 630S | Sun 13 19:12 | Wed 16 07:12 | Fri 04 09:00 | Fri 04 14:00 | Mon 07 10:00 | Tue 08 19:12 |
Fujairah terminal Cut off Details - WK 34-35 2026
| Port | Vessel Name | Voyage | ETA | ETD | Booking Cut off | Load list / SI/ VGM Cut off | ED Document to be share with Maersk | Jebel Ali Gate in / Inspection |
|---|---|---|---|---|---|---|---|---|
| Fujairah Terminal | GSL ROSSI | 634S | Mon 24 23:00 | Thu 27 06:00 | Mon 17 09:00 | Mon 17 14:00 | Tue 18 10:00 | Wed 19 23:00 |
| Fujairah Terminal | GFS GENESIS | 015E | Fri 28 15:00 | Sun 30 15:00 | Fri 21 09:00 | Fri 21 14:00 | Fri 21 17:00 | Fri 21 17:00 |
| Fujairah Terminal | SAFEEN POWER | 634S | Mon 31 15:50 | Wed 02 22:50 | Mon 24 09:00 | Mon 24 14:00 | Tue 25 10:00 | Wed 26 15:50 |
| Fujairah Terminal | GFS PRIDE | 047N | Tue 01 23:00 | Wed 02 23:00 | Tue 25 09:00 | Tue 25 14:00 | Wed 26 10:00 | Thu 27 23:00 |
| Fujairah Terminal | GSL ROSSI | 636S | Tue 01 11:00 | Thu 03 18:00 | Tue 25 09:00 | Tue 25 14:00 | Wed 26 10:00 | Thu 27 11:00 |
| Fujairah Terminal | GFS PRIDE | 049N | Sun 06 04:00 | Mon 07 04:00 | Fri 28 09:00 | Fri 28 14:00 | Mon 31 10:00 | Tue 01 04:00 |
| Fujairah Terminal | GFS PRIDE | 051N | Wed 09 11:00 | Thu 10 11:00 | Tue 01 09:00 | Wed 02 14:00 | Thu 03 10:00 | Fri 04 11:00 |
| Fujairah Terminal | GFS GISELLE | 042E | Thu 10 20:00 | Fri 11 18:00 | Thu 03 09:00 | Thu 03 14:00 | Fri 04 10:00 | Fri 04 17:00 |
| Fujairah Terminal | SAFEEN POWER | 636S | Fri 11 04:00 | Sun 13 11:00 | Fri 04 09:00 | Fri 04 14:00 | Fri 04 17:00 | Fri 04 17:00 |
| Fujairah Terminal | GFS PRIDE | 053N | Sun 13 11:00 | Mon 14 11:00 | Fri 04 09:00 | Fri 04 14:00 | Mon 07 10:00 | Tue 08 11:00 |
| Fujairah Terminal | GFS GENESIS | 016E | Sun 13 08:00 | Tue 15 08:00 | Fri 04 09:00 | Fri 04 14:00 | Mon 07 10:00 | Tue 08 08:00 |
| Fujairah Terminal | GSL ROSSI | 638S | Wed 16 04:00 | Fri 18 11:00 | Wed 09 09:00 | Wed 09 14:00 | Thu 10 10:00 | Fri 11 04:00 |
| Fujairah Terminal | GFS GISELLE | 043E | Mon 28 15:00 | Tue 29 11:00 | Mon 21 09:00 | Mon 21 14:00 | Tue 22 10:00 | Wed 23 15:00 |
If the actual commodity is Steel Coil or Metal Material Article with weight of per unit more than 2 tons then you must have to follow a Process of standard stuffing to avoid cargo shift during transport.
If single Commodity weight is more than 2 ton or Commodities in bundles or multiple commodities put on pallet then Single pallet weight is more than 2 ton, we require stuffing images in word file format for each container separately.
If your actual Commodity is METAL COIL / Similar = Please refer attached TT Club guidelines + COIL REQUEST TEMPLATE version 1.16
If your actual Commodity is Metal Plates / Similar = Please refer attached Plates A REQUEST TEMPLATE version 1.4
If your actual Commodity is Metal Pipes/Rod / Similar = PIPE D Heavy Bars REQUEST TEMPLATE version 1.3
Please do not gate-in Containers until Stuffing wise acceptance is received from our side.
Important note: Unless the pictures of stuffing and securing are sent and stuffing acceptance confirmation received from our end, kindly do not seal the box or move them to gate in. Improper lashing / securing can be unseaworthy and pose threat to life and can damage crane/vehicle/cargo/container and/or vessel.
Export:
Export Class 5 IMDG Containers shall be shipped from Port within 3 Days.
Transshipment:
Transshipment Class 5 IMDG Containers shall not be stored in Port more than 7 Days.